Construction site guides

Nine practical guides to the recurring work of a Turkish construction site: the hakediş (progress payment), quantity take-off, daily reports, room schedules, drawing revisions, the schedule and critical path, bid comparison, subcontracts and site documents, plus a glossary of 81 Turkish terms. Each includes worked numbers, a checklist and sources.

Line drawing of rolled drawing sheets

Who are these guides for?

Site managers, field engineers, project managers, architects and subcontractors working in Türkiye, on private jobs with subcontractors and on public works under the Turkish public procurement rules. Each guide opens with a short answer, then covers the sub-questions, the steps, common mistakes and a checklist, with links to primary sources. Tax rates that depend on the case are given as the general rule with the conditions, and should be confirmed with your accountant. Example figures come from Santix's sample project, the app's own calculation tests or clearly labelled worked examples, not from customer data.

Money and quantities

  • How to prepare a hakediş: measurement, cumulative billing and deductions, with a line-by-line example from ₺100,000 to ₺89,552 payable.
  • Quantity take-off: floor, wall, ceiling and skirting quantities, deducting openings, concrete and rebar, with worked room examples.
  • Bid comparison table: collecting bids against one estimate, catching missing items and scoring with weights, with a three-bid example.
  • Subcontract checklist: scope, price, advance, retention, penalty and cap, social security and tax clauses; 20 points before signing.

Drawings and site

Time and paperwork

Which guide do you need?

SituationGuide
Month end, preparing a subcontractor's paymentHakediş, then take-off
Asking for bids on a work packageTake-off, then bid comparison
A bid is chosen and the contract is nextSubcontract checklist
A new sheet version arrived from the architectRevision management
The job is late and you need the effect on the finish dateSchedule and critical path
An inspection is comingDocuments and daily report

See which Santix module covers each task on the features page.