Construction management, on the drawing

Santix is a construction site and project management app where the site manager, engineers, architect and subcontractors work on the same drawing. Upload a DWG, DXF or PDF, tap a room, leave a note with a photo.

Coming soon to the App Store. Early access through TestFlight.

iPad · landscape · sheet A-101
A-101Plan viewer on iPad. Tap a room and its data sheet opens. The drawing is a synthetic sample; the app interface is Turkish.
DWG · DXF · PDF
Split into sheets on our own server; sheet number, title and scale read from the title block.
267 rooms
In a November 2026 test, 11 sheets and 267 rooms were extracted from a 7-storey project drawing in about 11 minutes.
30 · 14 · 7 · 1
days before expiry: reminders for permits, policies, bonds and inspections.
4.999 ₺/month
up to 5 users, VAT included; about 1.000 ₺ per user. 3-day trial.
S-001Definition

What is Santix?

What is Santix? A construction site and project management app for building contractors, on iPhone and iPad. The drawing is the centre: notes, revisions, progress and room data sit on the sheet, while the schedule, contracts, procurement, budget and documents link to the same project.

Owners, project managers, site managers, field engineers, architects and subcontractors share one project; each role sees only what it is allowed to. It keeps recording without a connection. Built in Türkiye for Turkish site practice: progress-payment deductions, central-bank exchange rates, room schedules and title-block reading follow local conventions.

S-102One day

What does a day on site look like in Santix?

One day on the sample project Ataşehir Blok B. Nobody types the same thing twice; each step builds on the previous record.

TimeWhoWhat happens
07:30Site managerChecks late items, revisions awaiting approval and expiring documents on the overview.
08:00Site managerHands out the day’s work to subcontractors as pins, each with sheet, room, due date and photo.
10:00Field engineerNo signal in the basement; pins a waterproofing defect with photo and voice note, saved on the device.
13:00SubcontractorFinishes the tile grout and marks the pin ready for checking with a photo.
15:00Field engineerInspects and closes the pin, marks the finished tiled area on the drawing.
16:30ArchitectAnswers a revision request from the office and uploads the new sheet version; pins move across.
Month endSite manager and ownerThe subcontractor’s payment is calculated cumulatively, deductions applied, approved by amount.

The full flow from site to payment

A-101Drawing and notes

A note stays where it belongs on the drawing

Drop a pin, add photos, a voice note or video, assign it, set a due date. Instead of a photo lost in a chat group, an item with a place on the drawing, an owner and a date.

  • Six typesTask, defect, information request, observation, safety, revision request.
  • Status shown by shape tooOpen, in progress, awaiting check, done; shapes differ for colour-blind users.
  • Subcontractors see their ownThey close assigned items with a photo and never see other firms’ items.
  • Survives new versionsWhen a sheet is revised, pins move to the new version by drawing coordinates.

Drawing markup

Pins and notes: each one keeps its place on the drawing, photos, voice notes and due date.
A-102Room data

Tap a room, its data sheet opens

Net area, perimeter, clear height, wall and ceiling area; floor, wall and ceiling finishes; doors and windows. Every value says where it came from.

  • paftadanRead from the drawing: area and perimeter are computed from the room polygon.
  • mimarEntered or approved by the architect.
  • düzenlendiChanged on site, with history kept.
  • Sapma bildirIf a value does not match the site, one tap opens a revision request.

Room data sheets

Z-03Room data sheet. Each value shows its source: read from the drawing (paftadan), entered by the architect (mimar) or edited (düzenlendi).
A-103Revisions

Revisions travel an approval chain to the architect

A request raised on site does not reach the architect without the site manager’s approval. Each step keeps its date and person; when the new sheet is uploaded the old one moves to history and the two can be overlaid.

  1. 1 Site raises it
  2. 2 Site manager approves
  3. 3 Architect answers
  4. 4 New version is issued

Revision tracking

Revision request: raised on site, approved by the site manager, answered by the architect. Every step keeps its date and person.
A-104Progress

Mark finished areas on the drawing, Santix does the percentages

The crew draws the finished part over a room or marks the whole room. The percentage uses the right quantity for each work item and flows into the schedule and the project overview, so “how far along are we” is answered from the drawing, not a guess.

  • Tiling, screed, parquetComputed from the room’s net floor area.
  • Paint, plaster, wall finishesComputed from wall area with doors and windows deducted.
  • Skirting and fixturesComputed from perimeter or a count.
  • Photo evidenceEach progress mark can carry photos, recorded offline too.
  • Feeds tasks and the GanttTask progress is the quantity- or cost-weighted sum of its rooms.

Progress tracking

S-101Project overview: progress, late items, pending approvals and expiring documents at a glance.
P-201Schedule

Santix computes the critical path

Tasks, dependencies (FS, SS, FF, SF with lag), milestones and total float. Gantt on iPad, a list on the phone. Import MS Project XML and Primavera P6 XER files.

P-201Gantt on iPad. Critical tasks are highlighted; the today line carries the same end ticks as a dimension line.

Schedule and Gantt

P-202Payments and budget

Progress payments, line by line, with approvals

This period’s amount is cumulative work minus previous payments; retention, advance recovery, withholding tax, stamp duty and VAT withholding sit on separate lines. Above a threshold the owner must approve.

  • Several currenciesTL, USD and EUR lines converted with the central bank (TCMB) rate of the date.
  • Estimate from ExcelMatch the columns, confirm, and the budget lines are in.
  • Who sees the budgetBy default the owner, site manager and project manager; switch per role or person.

Progress payments and budget

P-202Progress payment (hakediş) breakdown: this period = cumulative work − previous payments, then each deduction on its own line.
P-203Procurement, contracts, documents

Bids, contracts and documents in the same project

  • Bid comparisonLine-by-line price, duration, payment term, guarantee; price weighted 60 % by default. The chosen bid goes to the budget.
  • Contract templatesTemplates for 40 trades, missing details asked as questions, critical clauses flagged, key dates reminded. Not legal advice.
  • Document trackingPermits, policies, bonds, inspection reports. Scan with the camera; number and expiry date are read for you to confirm.

Bid comparison · Contract templates · Document tracking

P-205Documents are sorted by expiry date. Reminders arrive 30, 14, 7 and 1 day before.
X-301Site conditions

Works in the basement, everyone sees their own

Records entered without a connection wait on the device and go when it returns. Permissions are enforced in the database at row level: a subcontractor never sees another firm’s bid, a field engineer never sees the budget.

ModulePatronProje müd.Şantiye şefiSaha müh.MimarTaşeron
Bütçe ve hakedişAR/WR/W–––
SözleşmelerAWR/W––kendi
PaftalarAWWR + pinWR
Revize onayı––Aaçarcevaplar–
İş programıAWWWRkendi
EvrakAWWWRkendi
A: full, W: write, R: read, kendi: own records only. Budget visibility can be switched per role and per person.

Who it’s for

X-301Records entered offline stay on the device and are sent automatically when the connection returns.
P-206Team and suggestions

Invite codes, budget visibility and approved suggestions

  • Invite codes8 characters, valid 14 days, single use. The code carries the role and the subcontractor’s firm; seats are enforced in the database.
  • Budget visibilityNone, summary or full for each role. By default the owner, project manager and site manager see everything.
  • NotificationsAssignments, pin status, revision steps, payments awaiting approval and document expiry go only to the people concerned.
  • AI suggestionsLayer classification, room schedule matching, Excel columns, document reading, contract help and bid summaries. You approve; no drawing geometry is sent.

Team and invites · AI assistance

P-204Contract wizard. Your answers fill the draft; critical points appear as margin notes.
K-500Who it’s for

Every role in one project, with its own permissions

Santix is written for construction firms that work with subcontractors: residential and commercial contractors, project management firms, and their architects and subcontractors. Each role sees only the sections open to it.

Roles and the full permission table

S-900Status

What is ready today, and what is not

When choosing site software, knowing what it does not do matters as much as what it does. Where things stand today:

  • ReadyDrawings, pins, room data, revisions, progress, schedule, payments and budget, purchasing, 40 contract templates, documents, team, offline work.
  • Early accessComing soon to the App Store; for now through TestFlight. Android is in preparation.
  • Not yetWeb price research, e-signature, an English app interface, a web version of the field app.
  • Does not replaceThe statutory electronic site diary (Şantiye-M), accounting and e-invoicing, timesheets and payroll, warehouse stock.
  • Legal noteContract templates are awaiting legal review and are not legal advice; have them checked before signing.
  • DataStored in Frankfurt (EU), drawings processed in Frankfurt. No ads, tracking or location collection.

Security

S-200Pricing

Monthly per organisation, by number of users

Every active user, including architects and subcontractors, is a seat. New organisations get a 3-day trial; afterwards nothing is deleted, the account becomes read-only. For annual plans and teams over 50, contact us.

Plan5 users 4.999 ₺ /month Per user 999,80 ₺
5 seats
VAT included, monthly on the App Store
Plan10 users 8.999 ₺ /month Per user 899,90 ₺
10 seats
VAT included, monthly on the App Store
Plan25 users 19.999 ₺ /month Per user 799,96 ₺
25 seats
VAT included, monthly on the App Store
Plan50 users 34.999 ₺ /month Per user 699,98 ₺
50 seats
VAT included, monthly on the App Store

Pricing details

R-00Guides

Guides for the site

From progress-payment deductions to room schedules, critical path and document validity: worked examples with sources.

All guides

Frequently asked questions

Which devices does Santix run on?

iPhone and iPad. Wide views such as the Gantt chart and side-by-side panels open on iPad; the phone shows the same data as lists. An Android version is in preparation. The interface is in Turkish.

Which files can I upload?

DWG, DXF and PDF for drawings; MS Project XML and Primavera P6 XER for schedules; Excel for cost estimates. DWG and DXF files are split into sheets on Santix’s own server.

Does it work on a site without internet?

Yes. Notes, photos and progress entered offline stay on the device and are sent automatically when the connection returns. Download a project in advance and its drawings open offline too.

How is the price calculated?

Per organisation, by number of users: 5 users 4.999 ₺, 10 users 8.999 ₺, 25 users 19.999 ₺, 50 users 34.999 ₺ a month, VAT included. Every active user, including architects and subcontractors, is a seat. New organisations get a 3-day trial.

Does a subcontractor see everything?

No. Subcontractors see only items assigned to them, their own contract and their own documents. Budgets, payment amounts and other firms’ bids are visible only to people you authorise.

How do I add my team?

In the project’s team section, pick a role and create an 8-character invite code to share by WhatsApp, SMS or email. Codes are valid for 14 days and work once; the person joins the right project with the right role.

Can I bring my existing schedule and estimate?

Yes. Schedules import from MS Project XML or Primavera P6 XER. An Excel estimate goes into the budget and a price list into a purchase request; Santix suggests the column mapping and you confirm it.

What does the AI do with my data?

It prepares suggestions in six places only: layer classification, room schedule matching, Excel columns, document reading, contract help and bid summaries. Nothing is saved without approval, no drawing geometry is sent, and OpenAI is asked not to store requests.

Which deductions does the progress payment include?

Retention, advance recovery, delay penalties, income tax withholding, stamp duty and VAT withholding sit on separate lines, then VAT is added. The calculation is cumulative: this period is total work to date minus previous payments.

Does Santix replace the site diary or accounting software?

No. The statutory electronic site diary (Şantiye-M) and accounting stay separate. Santix records site work, photos, approvals and payments; it does not issue invoices.

All questions

Let’s try it with one of your drawings

Send us a drawing and your cost estimate; try Santix on your own project through TestFlight early access. We help with setup and migration.