Running a site on Excel and WhatsApp, or on Santix?

Excel and WhatsApp are free, familiar and flexible, and enough for a small one-person job. As the team grows they break: nobody knows which drawing is current, photos get lost in the chat, and payment formulas are copied between files. Santix covers those points; it is paid and needs an iPhone or iPad.

₺4,999/mo
Santix plan for 5 users, incl. VAT; Excel and WhatsApp are free
3 days
trial; with no plan the account becomes read-only, no data deleted
4 scenarios
progress payment, revision distribution, punch list, bid comparison

What do Excel, WhatsApp and paper do well?

Most construction sites in Türkiye are run today on Excel, a WhatsApp group and paper, for good reasons. These tools are free or already in the office, nobody needs training, and they fit whatever habits a firm already has.

  • Cost: WhatsApp is free, and most offices already have Excel. Every site has paper and pens.
  • Learning: From the foreman to the owner, everyone can send a photo on WhatsApp. No new app, password or habit.
  • Flexibility: In Excel you add whatever column you need and build your own payment format. No software fits every firm's format that well.
  • Open to all: Android or iPhone does not matter; the subcontractor's foreman joins the group and nobody pays for a seat.
  • Speed: A photo and "sort this out by tomorrow" takes ten seconds.
  • Official formats: The payment summary, quantity book and measurement sheets for the client or a public body are often required in a specific Excel template.

For one job run by one or two people these tools are usually enough. Problems start when several subcontractors, revisions and payment periods run at once.

Where does site tracking in Excel and WhatsApp break?

The limit of Excel and WhatsApp is that information is not connected: the photo is in one place, the drawing in another, the payment in a third file. On site that turns into concrete problems.

Which drawing version is current?

The architect posts a revised drawing to the group as a PDF; a week later three versions of the same sheet are circulating. A foreman looks at the old PDF on his phone and builds the wall in the wrong place. In Santix everyone sees one current sheet marked "R3 · güncel" and can overlay it on the old version. See revision tracking.

Photos get lost and locations are described in words

A snag photo sinks under hundreds of messages, and people try to work out the spot from "block B, ground floor, second bathroom on the right". In Santix the photo sits inside a pin on the drawing and is linked to its room: "#14 Banyo seramik derzi eksik" sits in that exact corner of bathroom Z-03. See drawing markup.

No answer to "was it done?"

A task assigned in WhatsApp has no owner, due date or status. Who finished what is found only by scrolling back. In Santix every pin has an assignee, due date, priority and a status such as open, in progress, blocked, awaiting inspection, done or closed.

Payment formulas are copied from file to file

Each month last month's payment file is copied, rows are updated by hand, a formula breaks and nobody notices. The cumulative total and previous payments stop agreeing. Santix computes the period cumulatively and applies retention, advance recovery, withholding tax, stamp duty, VAT withholding and penalties in one place. Method in the progress payment guide.

No reminders

The scaffold inspection report or guarantee letter expiry sits in a cell, but Excel warns nobody. Santix notifies 30, 14, 7 and 1 day before a document expires.

Everyone sees everything

In a WhatsApp group a subcontractor also sees other subcontractors' photos and arguments; the budget spreadsheet is either shared or not. In Santix a subcontractor sees only their assigned work, and by default only the owner, project manager and site manager see the budget.

Photos piling up in the basement

Photos taken with no signal pile up on the phone, get sent in a batch in the evening and nobody knows which belongs where. WhatsApp also sends once the connection returns; the difference is that in Santix the record is tied to its spot on the drawing even while offline.

A-101Plan viewer on iPad. Tap a room and its data sheet opens. The drawing is a synthetic sample; the app interface is Turkish.

Four scenarios: Excel and WhatsApp versus Santix

The four scenarios below happen every month. For each we describe how most sites do it today, then how it is done in Santix. Examples come from our sample project "Ataşehir Blok B"; figures are examples.

1. Month-end subcontractor payment

StepExcel and WhatsAppSantix
MeasurementThe technical office takes measurements on site and writes measurement sheetsThe same; room areas and progress marked on site are ready as a cross-check
Period amountLast month's file is copied and the cumulative column updated by handThe cumulative amount is entered and previous payments are subtracted automatically
DeductionsRetention, advance recovery, withholding, stamp duty and VAT withholding formulas in cellsDeductions are added one by one, with rates and basis shown in the breakdown
ApprovalThe file goes by email; approval is verbal or a signed printoutThe site manager approves in the app, the owner too above the threshold; who approved when is recorded
Payment trackingA separate list from accountsMarked as paid; flows into actual spend in the budget

Santix does not produce the official payment summary format a public client requires; it holds the calculation and approval record, and payments can be exported to Excel.

2. Getting a revised drawing to site

StepExcel and WhatsAppSantix
Problem on siteA photo goes to the group and the architect is phonedThe field engineer raises a revision request from a pin
FilteringEvery question goes straight to the architectThe site manager approves, or rejects with a reason
AnswerA new PDF arrives by email or in the groupThe architect accepts and attaches the new version in the same step
DistributionEveryone is assumed to have the new PDF; old prints stay on siteEveryone opens the new version in the app; pins move to it
RecordWho said what and when is scattered through the chatA timeline: raised, approved, sent to architect, accepted, closed

3. Punch list and handover

StepExcel and WhatsAppSantix
RecordingWritten on paper, typed into Excel in the evening, photos in a separate folderA pin drops on the drawing with photo and voice note straight away
DistributionThe list goes to subcontractors as a PDF or message; everyone sees all of itEach subcontractor sees only items assigned to them
Follow-up"Which ones are done?" is asked by phoneThe subcontractor marks awaiting inspection with a photo, the site manager checks and closes
Status reportColour coding in ExcelFilters by type, status, person and room; overdue items apart

4. Bid comparison table

StepExcel and WhatsAppSantix
ItemsCopied from the cost estimate spreadsheetTaken from Excel, with an AI suggestion for the column mapping
BidsEach firm's own format is moved into one table by handEach bid is entered against the same items; duration, terms, advance, retention and brand in their own fields
EvaluationThe lowest total wins, or weights live in someone's headWeighted score: price 60 %, duration 10 %, payment terms 10 %, quality 15 %, references 5 %; weights can be changed
Next stepThe chosen price is typed into the budget and contract by handPost to budget and start the contract from the bid

To build the table in Excel yourself, criteria and scoring are in the bid comparison table guide.

Excel and WhatsApp compared with Santix

The table says honestly which side leads on each point. Excel and WhatsApp lead on cost, learning, flexibility and device choice.

CriterionExcel + WhatsApp + paperSantixAhead
CostFree or already ownedFrom ₺4,999/month for 5 users, incl. VATExcel + WhatsApp
Learning timeEveryone already knows themThe team has to get used to a new appExcel + WhatsApp
Format flexibilityBuild any table you likeDefined screens and fieldsExcel + WhatsApp
DevicesAndroid, iPhone, computeriPhone and iPad; Android in preparationExcel + WhatsApp
Outside peopleSubcontractors join the group freeEvery active user is a seatExcel + WhatsApp
Offline recordingMessages send when the connection returnsRecords stay on the device and sync laterSimilar
Current drawingSeveral PDFs circulate in the groupOne current version with its number and dateSantix
Photo locationIn the chat, described in wordsIn a pin on the drawing, linked to the roomSantix
Assignee, due date, statusWritten in a message, tracked by handOn every pin and taskSantix
Revision approvalVerbal or by messageSite, site manager approval, architect, close; notified at each stepSantix
Progress paymentsFormulas copied, errors missedCumulative calculation, deductions and approval chainSantix
Schedule and siteProgramme in one file, site status in messagesProgress on site rolls up into tasks and the GanttSantix
Document remindersNoneNotifications 30, 14, 7 and 1 day before expirySantix
Role-based visibilityEveryone in the group sees everythingSubcontractors see only their work; budget only for those allowedSantix
Who changed whatSearched for between file versionsPin history, approval history, audit logSantix

When should you stay with Excel?

If you run one small job with one or two people, have little subcontractor coordination and the drawings rarely change, staying with Excel and WhatsApp is a reasonable choice. A monthly subscription may cost more than it saves.

  • If most of your team uses Android, wait for now; Santix currently runs on iPhone and iPad only.
  • If the work is a refurbishment or a single trade, the drawing and room layer may be more than you need.
  • If what you really need is timesheets, stock, stores or accounting, Santix does not do those.
  • If you must fill in a client's official payment format, that file stays in Excel; Santix keeps the check and approval of the calculation.

You do not have to give up WhatsApp either. Quick calls and day-to-day chat can stay there; snags, revisions, payments and documents that need a record move to Santix. Moving makes sense when several subcontractors, regular revisions and monthly payments run at once.

How do you move from Excel to Santix?

Moving starts by importing the files you already have; you do not re-enter data from scratch. The order below covers the first two weeks on a live site.

  1. Organisation and project: Create your organisation and project in the app. The 3-day trial starts here.
  2. Drawings: Upload DWG, DXF or PDF. Santix splits the file into sheets and reads sheet number, title and scale from the title block. In testing a 7-storey drawing set became 11 sheets in about 11 minutes. The team downloads the drawings to their devices.
  3. Rooms: The architect or technical office approves suggested rooms; the Excel room schedule is matched in the finishes step.
  4. Budget: Import your cost estimate spreadsheet. An AI suggestion maps item code, description, unit, quantity, unit price and total columns, and you confirm it.
  5. Schedule: If it is in MS Project or Primavera, import the XML or XER file; the critical path is recomputed. Then save the baseline.
  6. Team: Invite the site manager and field engineers first, then the architect, then subcontractors. Codes have 8 characters, are valid for 14 days and are single-use.
  7. Open snags: Turn the open items in your Excel snag list into pins on one site walk; closed items do not need to move.
  8. First payment: Run one payment period in both Excel and Santix and compare. If the figures agree, keep Excel as an archive.

There is no automatic import for past payment files or closed revisions; they stay in your Excel and PDF archive. Prices and seat counts are on the pricing page.

Frequently asked questions

Do I have to close the site WhatsApp group?

No. Day-to-day chat can stay in WhatsApp. Once snags, revisions, payments and documents that need a record move to Santix, the group stops being your archive.

Can I import my Excel cost estimates and payment files?

You can import a cost estimate into the budget and into procurement items; an AI suggestion maps the columns and you confirm it. There is no automatic import for past payment files.

My subcontractors use Android. What should I do?

Santix currently runs only on iPhone and iPad; Android is in preparation. If most subcontractors are on Android, keep following them the current way for now.

When should I stop using Excel?

After running one payment period in both Excel and Santix and comparing the results. If the figures agree and the team is used to pins, keep Excel only as an archive.

Can I get data from Santix into Excel?

Yes. Budget and payments export to an Excel file, including rate and rate date columns, which you can give to your accountant or client.

We use Google Sheets or a shared Excel file. Is there still a difference?

A shared sheet solves file copying, but it does not tie photos to a spot on the drawing, set role-based visibility or an approval chain, or send expiry reminders. The difference stays on those points.